K2 Designer for Visual Studio 2012 - K2 Toolbar
The K2 blackpearl Toolbar enables the user to customize the layout of the design canvas and perform standard user functions. The K2 blackpearl toolbar is accessible by right clicking on the general toolbar menu area and selecting / enabling the K2 Toolbar. The icons on display are custom configurable and depending on the object selected may be disabled for use. The disabled icons will enable once the appropriate object or objects are selected.
|
The K2 blackpearl Toolbar should not be confused with the K2 Toolbox. |
Feature |
What it is |
Align to Grid |
Aligns selected items to grid |
Align Lefts |
Align selected item left |
Align Rights |
Align selected item right |
Align Bottoms |
Align selected items to bottom of the grid |
Align Tops |
Align selected items to top |
Center Horizontally |
Center selected items |
Center Vertically |
Center selected items vertically |
Decrease Horizontal Spacing |
Decrease the spacing between the selected items |
Increase Horizontal Spacing |
Increase the spacing between the selected items on the canvas |
Decrease Vertical Spacing |
Decrease the spacing between the selected items |
Increase Vertical Spacing |
Increase the spacing between the selected items on the canvas |
Make Same Size |
Change the size of the selected items so that they are all the same |
Make Same Height |
Changes the height of the selected items to be all the same |
Make Same Width |
Changes the width of the selected items to be all the same |
View Code |
This will open the Process file as an XML file |
Lock Controls |
This will lock the selected object so that it can’t be modified |
Rotate Left |
Rotates the line label to the left |
Rotate Right |
Rotates the line label to the right |
Toggle Line Mode |
Enable line mode so that lines can be drawn. Short cut is to hold down Ctrl to enable line mode |
Collect Copy |
Creates a Rectangle so that part of the process can be copied to the clipboard as an Image |
Connect Activities |
When multiple activities are selected, the activities will be connected in the order of how the activities are selected |
Deploy |
The Deploy Project Wizard will open and guide the user through the deployment configuration |